When finishing for straight section alternate the direction of the wall cap.
Allan block wall caps.
H x 12 in.
Post caps are used to finish the top of a post or pillar.
Allan block products are inspired by nature and designed for life.
Find retaining wall block at lowe s today.
Tandem modular block clips clips included with tandem modular blocks.
Two post caps are needed to finish each post.
This will allow plantable soil to be placed flush against the cap unit.
All the collections can build the basic gravity wall system for smaller wall projects.
Check with your local allan block manufacturer for exact specifications and color availability.
Ab corners 55 lbs.
Place two caps on top of the wall spaced so a third cap will fit tightly between their widest point.
D x 18 in.
Wall caps straight walls.
Secure them in place with masonry adhesive.
Remove the center cap and cut along the marks.
Every allan block carries with it the testing engineering and field performance you want for a strong safe reliable wall system.
Wall caps are available to finish the top of the wall panels for straight or curved sections.
Position so that the fabric starts at the back of the ab fieldstone facing unit and.
Secure the wall caps in place with a bead of flexible concrete adhesive along both sides of the raised rings and along the side of each wall cap.
U start base block actual coverage length is 16 11 16 tandem modular block 7 1 16 x 7 7 8 x 7 7 8.
Place a strip of filter fabric along the top of the ab fieldstone anchoring units on the top course of wall.
Tandem wall cap 24 x 15 x 3 1 4.
Set the middle cap back in place so the three fit tightly together.
The allan block collections of retaining wall products give you a choice of styles to meet your site and design requirements.
Filter fabric is used on top of the top course of blocks and below the caps to cover the back of the ab fieldstone anchoring units.
What that means is that every allan block carries with it a promise to be durable naturally attractive and easy to install.
Wall caps are used to finish the top of a wall panel.
Using geogrid to reinforce the retaining wall allows taller projects to be built.
The apple pie of the allan block family of retaining wall products brings a refined look of classic beauty to any landscape.
Check with your local allan block manufacturer for exact specifications and color availability.
Set another cap on top of the first two caps and mark where they overlap on the bottom of the center cap.
Modular grid frame height 42 column kit 21 x 21 x 42.
U start base block 12 x 18 7 16 x 3 1 2 note.